Item Contractor A Contractor B
Remove stumps for septic, driveway, and cottage site 4,000.00 5,700.00
Strip topsoil for cottage and driveway 400.00 750.00
Excavate for frost-wall foundation 860.00 included above
Install driveway 4,389.00
(approx. 3850 SF)
2,970.00
(approx. 2200 SF)
Backfill foundation with excavated material and imported fill 5,790.00 825.00
Supply and place screened stone inside foundation 3,360.00 4,285.00
Install a 3 bedroom mound system including design and permit fees 25,700.00 bid forthcoming
Final grade after construction (re-lay topsoil) 800.00 not included