At this rate, the MVC will ship in 2025.
We've now got two sitework bids, and I've added the second one to the table below. The numbers are pretty close for the most part, except Contractor B is coming in way below on the backfill price. I need to find out if we're all talking about the same thing.
Also, I am going into the stump-grinding business.
Item | Contractor A | Contractor B |
---|---|---|
Remove stumps for septic, driveway, and cottage site | 4,000.00 | 5,700.00 |
Strip topsoil for cottage and driveway | 400.00 | 750.00 |
Excavate for frost-wall foundation | 860.00 | included above |
Install driveway | 4,389.00 (approx. 3850 SF) |
2,970.00 (approx. 2200 SF) |
Backfill foundation with excavated material and imported fill | 5,790.00 | 825.00 |
Supply and place screened stone inside foundation | 3,360.00 | 4,285.00 |
Install a 3 bedroom mound system including design and permit fees | 25,700.00 | bid forthcoming |
Final grade after construction (re-lay topsoil) | 800.00 | not included |